Scaffolding Steel Plank Supplier in China

Please enter your email.

cancel
lv5 shield

Sino-Sources

lv5 shield

Scaffolding Steel Plank Supplier in China

Payment Terms: TT or LC

Ref Price : 5-25$/piece

Supply Capability : 1000 piece

Loading Port : TianJin

Inquire Now Chat Online

Sino-Sources Service Pledge

  • Quality Product Quality Product
  • Purchasing Credit Purchasing
  • Credit Rating Credit Rating
  • Timely Delivery Timely Delivery
  • Order On-line Tracking Order On-line Tracking
  • Credit Services Credit Services
  • Product Detail
  • Company Profile
  • Qulck Details


    Quick Details:



    Place of Origin:

    Tianjin, China (Mainland)

    Brand Name:

    SINO EAST

    Model Number:

    AJ-Scaffolding walk board

    Type:

    Scaffolding Parts

    Scaffolding Part Type:

    Scaffolding Planks

    Material::

    Q235 steel

    Size::

    1830*400mm

    Thickness::

    2.5mm

    Weight::

    11.4kg

    Surface Treatment::

    galvanized

    Color::

    silver

    Connection::

    hooks

    Application::

    Steel Walking Board/Ladder for scaffolding








    Description:


     

    Commodity name

    Galvanized steel scaffolding plank made in China

    Specification 

    formwork tie rod and wing nut with high tensile strength, fasten the formwork panels tightly during concrete pouring process.
    Origin

    China Mainland

    Material

    pre-galvanized

    Weight

    Different specifications different weight
    Size 225*65*1.8mm/as your request
    Length as your request
    Process  others  
    M.O.Q 500
    certifications

      CE EN10219 / BV /SGS / BSI / ASTM A53

    Packing

      Factory steel pallet, safe and standard package

    Delivery time

    15-25 days after order confirmation

    Payment term

    L/C, T/T, D/P.western union 

    Business type

    Manufacturer and exporter

    color

    silver

    Advantage

    1.Top quality  2.Professional service  3.Competitive price, 4.Timely delivery 

    5.Standard package, 6. Easy installation 7. Professional manufacturer

    8.Durable and stable 9. Factory-low cost

    Notes

    Special marks can be made according to customers requirements;

    It is available to produce by customer drawing.

    Main products

    Different kinds of scaffold coupler, Ringlock scaffolding system,

    Cuplock Scaffolding System,Kwikstage scaffolding  system,shoring prop,

    formwork system, frame system, Accessories



    Products:



    High quality product of Scaffolding Steel Plank Supplier in China




    Equipment:



    Advanced equipment of Scaffolding Steel Plank Supplier in China



     

    Packaging & Shipping:



    Packaging and shipping of Scaffolding Steel Plank Supplier in China




    Certificate:


    CERTIFICATE OF SINO



    Advantages:

     

     

    1We have our own factory to produce our products.

     

    2We have a number of excellent line service team.

     

    3We offer a full range of quality assurance services.

     


     

    FAQ:

     

     


    Q: May I have some samples before bulk order?

    A: Yes, you can. We can arrange the shipment according to your requirements.

      

    Q: Do you have quality control?

    A: Sure. We have the most advanced testing equipment for very strict quality control. 

     

    Q:How about the delivery?

    A: By containers on ship or railway wagon ,and bulk ship . Safe and cost effective way of delivery . 

     

    QWhat about the lead time for mass production?

    AHonestly, it depends on the order quantity and the season you place the order.

     

     


     

    Contact US:

     

     


    Skype: paulpaul120481

     

    Mobile: +86 18622088833 (whatsapp,line)

     

    Email: info@sino-sources.com

     





  •    

    The nation's steel consumption is expected to rise 7.7 percent to 725 million metric tons this year amid an improving economy and better performance of major steel consumers, an industry research and planning institute said on Monday.The country's steel demand will grow by 0.7 percent to 730 million tons in 2018, said a report from the China Metallurgical Industry Planning and Research Institute.

    China's crude steel output will increase 3 percent year-on-year to 832 million tons in 2017, and by a further 0.7 percent to 838 million tons next year.Iron ore demand in the world's top buyer is expected to rise 1.3 percent to 1.122 billion tons in 2017 from last year and drop 0.2 percent to 1.12 billion tons in 2018.Major steel consumers including real estate construction, machinery, automobile, energy and shipbuilding will be the main contributors to the country's rising steel demand next year.

    Real estate construction will remain the biggest consumer of steel products in 2018, with demand amounting to 388 million tons, up by 0.3 percent from this year which is estimated at 387 million tons.The machinery industry comes second with 138 million tons of expected steel demand in 2018, up by 1.5 percent year-on-year, followed by the automobile industry with 59.5 million tons, and energy with 32.5 million tons.

    Li Xinchuang, president of the institute, said that China will continue to cut outdated steel capacity and manufacture more green and high-quality steel products next year."China's steel manufacturing infrastructure is the most advanced in the world. The small and unregulated steel mills, which are producing substandard steel with high pollution, should be eliminated," Li said."The steel enterprises should increase their investment in research and development as well as environmental protection to maintain their competitiveness in the world," Li added.

    Earlier this year, the National Development and Reform Commission, the country's top economic planner, set a timeline to phase out production of low-quality steel made from scrap metal, or ditiaogang, before the end of June.Authorities have sent 12 inspection groups to some areas including Hebei, Henan and Heilongjiang provinces, and the Guangxi Zhuang autonomous region to oversee the move, according to Lin Nianxiu, deputy head of the NDRC.China plans to reduce crude steel output by 100 to 150 million tons by 2020.

    More than 65 million tons of steel production capacity was phased out in 2016, beating the annual target. The country met the 2017 capacity reduction goal of 50 million tons by the end of August this year.In 2016, the central government spent over 30 billion yuan ($4.53 billion) helping 726,000 workers made redundant in the steel and coal industries to find new jobs. The number of workers to receive aid this year is estimated at 500,000.



Send a message to us:

upload

Remaining: 4000 characters