Before the PE pipe is used, it should be fully prepared
PE pipe fittings are widely used in the construction industry because of the good advantages of PE pipe fittings, but before the PE pipe fittings are used, they should be fully prepared to avoid any problems in the later stage.
Before installing the PE pipe fittings, it is necessary to dig the trenches, and the trenches are to be dug out of the soil to have a reasonable stacking place, and the trenches should not be too close, and the distance should be more than two meters. The excavated earthwork should be transported to the outside in time to avoid affecting future work. In the construction of PE pipe fittings, mechanical operation must be used, and the machine can be dug up to 20 cm above the bottom of the designed groove. The rest can be excavated by workers.
In order to ensure the safety of the construction, the construction period and the quality of the construction, it is necessary to fully understand and investigate the soil quality and groundwater level of the required construction site before construction, so as to ensure that there will be no accidents during construction!